Package and Pin Count: Confirm the Footprint Before Anything Else
The PIC18F25K80-I/SS is listed in an SSOP package with 28 pins. These are the two fields that connect the orderable part to the physical board, so they belong at the top of the checklist rather than at the end of it.
Start with the BOM line. The package field must read SSOP and the pin count must read 28, and both must match the footprint drawn on the assembly documentation. An SSOP body is a surface-mount device, so the assembly route is the SMT flow; the footprint, the paste stencil apertures and the placement program all have to be built around that body style. A line item that agrees with the schematic but not with the land pattern is still a line item that will not run.
Pin count is also the simplest incoming check. Twenty-eight leads is a countable property of the part, and it separates this device from other 28-pin parts and from parts in other body styles. Package and pin count are recorded per part number, so a different package designator is a different orderable item — not a substitute to be confirmed later at the line.
Place this check before quantity, before the second-source discussion and before any engineering review. Everything downstream assumes the part fits the board.

Temperature Range: Verifying -40 °C to +85 °C Against the Application
The rated operating temperature range for this part is -40 °C to +85 °C.
That range is a property of the device, not of the enclosure it is mounted in. The buying decision is therefore a comparison: take the environmental requirement that engineering has written down for the product and place it next to -40 °C to +85 °C. If the product's own specification sits inside that window, the device rating covers it. If any part of the product's specified environment falls outside the window, the rating does not cover it, and the line item needs to go back to engineering before it is released.
Two practical notes for procurement teams. First, ask for the environmental requirement in writing, as a range, so the comparison is against a number and not against an impression of where the product is used. Second, keep the comparison attached to the line item during the life of the build. A requirement that changes between revisions is easy to miss when only the part number is carried forward.
For buyers, the value of this check is that it is cheap to perform and expensive to skip. A temperature mismatch is not usually discovered at goods-in; it is discovered once the assemblies are built, which is the point where rework cost is highest.
Operating Voltage: Checking the 1.8 V to 5.5 V Window Against the Rail Design
The operating voltage window is 1.8 V to 5.5 V.
Verify this against the supply rail that the schematic assigns to the device, and do it from the same bill of materials revision that carries the part number. The window is wide, which makes it easy to assume compliance; the check is only worth doing if the rail voltage is read from the design and compared with the two limits, 1.8 V at the bottom and 5.5 V at the top.
Where a board has more than one rail, confirm which one feeds this device rather than which one dominates the design. Where a rail is produced by a regulator or a divider on the same board, the tolerance of that source matters as much as its nominal setting: a rail that sits outside 1.8 V to 5.5 V under any normal operating condition is outside the documented window, and the line item should be flagged for engineering review.
Record the rail and the voltage window together on the checklist. When a project moves to a new board revision or a new power architecture, the voltage line is the one most likely to change without the part number changing with it.
Memory Budget: Flash, SRAM and EEPROM on One Line Item
Three memory sizes sit behind a single orderable part number, and all three should be signed off together.
| Parameter | Verified value |
|---|---|
| Flash memory | 32 Kbytes |
| SRAM | 3.6 K |
| EEPROM | 1,024 bytes |
For a buyer, the point is that these are fixed by the part number. There is no memory option to select at the ordering stage, so a memory shortfall is a part-number change, not a configuration change. That makes the comparison with the firmware budget a release-gate item rather than a post-build concern.
Ask engineering to confirm three things against these figures: that the application code and its update path fit within 32 Kbytes of Flash; that the stack, buffers and working variables fit within 3.6 K of SRAM; and that the parameters intended to survive power cycles fit within 1,024 bytes of EEPROM. If any of the three fails, the answer is a different device, and the earlier that is known the cheaper it is.
Keep the three values on the checklist next to the part number. They are also useful during a design review of an existing product, when the question is whether a firmware addition still fits the silicon already on the board.
Clock and ADC: The Performance Attributes Engineering Should Sign Off
Two attributes on this part are performance decisions rather than purchasing decisions, and they should carry an engineering signature on the checklist.
The first is the clock frequency, 64 MHz. Confirm that the firmware and its timing budget were written against this figure, and that the external components around the clock circuit were chosen for the same operating point. Frequency is not a field procurement can validate from a datasheet alone; it needs the design's own timing analysis behind it.
The second is the ADC resolution, 12 Bit. Confirm this against the measurement requirement in the product specification. Resolution drives how the analog front end is designed and how sensor readings are scaled in firmware, so a mismatch is felt in the software as well as in the schematic.
Neither value changes with quantity, packaging or shipment, which is exactly why they are worth recording: they are stable reference points that a later revision can be compared against. When a product is re-sourced, retooled or handed to a new design team, these two numbers show quickly whether the silicon still matches the design intent.
Communication Interfaces: USART, SSP and CAN Checks
The interface set on the PIC18F25K80-I/SS is specific, and it should be matched line by line against the connectivity the design actually needs. The device provides two Enhanced USARTs that support LIN/J2602, one Master SSP module capable of both SPI and I2C™ (Master and Slave) modes of operation, and an Enhanced CAN module.
Read that as three separate confirmations rather than one.
First, the serial ports: two Enhanced USARTs, with LIN/J2602 support. Check how many asynchronous channels the design uses and whether the LIN requirement is real for this product.
Second, the SSP module: one module that can operate in SPI or in I2C, in Master and Slave modes. Because it is a single module, a design that needs both protocols at the same time needs a different arrangement, and that is a question for engineering rather than for the supplier.
Third, the CAN module: an Enhanced CAN module. Confirm with engineering that the CAN variant named in the product requirement is the one the design was built around, since CAN requirements are often written at system level and inherited by the BOM.
Write the confirmed interface list next to the part number. It is the fastest way to catch a line item that carries the right package and the wrong connectivity.

Current Consumption: Reading the Typical Figures Correctly
Two current figures are published for this part: a quiescent current of 13 nA, Typical, and a supply current of 3.8 µA, Typical.
The word to stop on is "Typical". A typical figure describes a representative device under the conditions stated in the datasheet. It is not a maximum, it is not a guaranteed limit, and it should not be used as the worst case in a power budget. When a design's current budget, battery life estimate or thermal calculation depends on these numbers, the figure that governs the design is the maximum published for the relevant condition — and that maximum has to be read from the datasheet for the operating point in question, not carried over from the typical value.
The practical rule for the checklist: record the typical figures as published, and mark whether the design budget depends on them. If it does, flag the line for engineering to confirm against the guaranteed limits before release.
Note also what the two figures describe. A quiescent current and a supply current are measured under different conditions, so they answer different questions and should not be added together or substituted for one another. Treat each as its own entry.

How to Request a Quote
Send the requirement to NexCir and a quotation for the PIC18F25K80-I/SS can be prepared against it.
To make the request unambiguous, include:
- the full part number, PIC18F25K80-I/SS, exactly as it appears on the BOM;
- the quantity required;
- the package and pin count as confirmed on your line item — SSOP, 28 pins;
- any application requirements your team has already checked against the temperature range and the operating voltage window, so the quotation is matched to the same revision you are building to.