Why the Full Part Number Belongs on the BOM Line
The identifier this checklist is built around is A3959SLPTR-T, and it belongs on every document that travels with the order: the BOM line, the purchase order, the goods-in record and the label at the receiving bench. Shortened references are a common source of mismatches, because item masters and supplier catalogues key on the complete string. Two numbers that differ by a few characters are different parts, and a truncated form does not tell the buyer which one is meant.
The practical check is a character-by-character read. Compare the number on the BOM against the number in the supplier documentation and on the incoming package label, including every letter, digit and separator. If a drawing, an email or an internal spreadsheet quotes a shorter form, treat that as an open item to close before the line is released rather than as a harmless abbreviation.
Keeping the full string intact in the item master also means a colleague re-ordering the same item later does not have to reconstruct it from memory or from an old email thread.
Package Format and Pin Count: Confirming Board Fit
The A3959SLPTR-T is supplied in a 28-pin TSSOP with an exposed thermal pad, and the pin count is 28. Two checks follow from those two facts, and both should be closed before the order is placed.
The first is the land pattern. Compare the footprint on your board with the package described: a TSSOP body in the 28-pin format, plus a land for the exposed thermal pad on the underside. A footprint drawn for a package without a thermal pad, or for a different lead count, will not accept the part as described. Ask the layout owner to confirm the pattern is the one intended for this package and record that confirmation with the design files.
The second is goods-in verification. Take a sample from the incoming package, count the leads and confirm the count is 28, and confirm the body is a TSSOP with a visible thermal pad. This is a visual comparison against the ordered description, not a functional test; its purpose is to catch a mixed or mislabelled package before it reaches the line.

Record the package style and the pin count side by side in the item master so that the two are always checked together, and state both in the technical annex of any request for quotation.
Operating Voltage: Checking the Supply Window Against Your Rail
The stated operating voltage is 9.5 – 50 V. Before ordering, the buyer should have the limits of the target rail in hand and compare them with both endpoints of that window.
The first check is the bottom end. If the rail can sit below 9.5 V at any point in the operating sequence — during start-up, during a dip, or after a load step — then the design is outside the stated range at that moment. The second is the top end: if the rail can exceed 50 V, including during transients, that also falls outside the window. Both checks concern the extremes your supply can actually reach, not the nominal figure printed on the schematic.
Write the two endpoints into the design review record and into the technical part of the quote request, so that internal reviewers and the supplier are evaluating the same numbers. If the rail changes later, the same reference is there to re-check against.
Output Current and On-Resistance: Load and Loss Checks
Two figures govern the drive side: the output current is given as ±3.0 A, and the on-resistance is 300 mΩ.
The ±3.0 A rating is the reference for the load. Confirm that the current the load actually draws sits within that figure, and that the comparison is made under the conditions the design will run in. The specification is written as a symmetric limit, so the check should cover both polarities rather than the forward direction alone.
The on-resistance is the conduction-loss parameter. Current flowing through the output passes through that resistance, and the resulting heat has to leave the package. This is where the package section reconnects to the electrical check: the exposed thermal pad is part of the heat path, so a footprint that ignores it leaves the loss created by the on-resistance with no route out of the body.

Put both figures on the load-check sheet, together with the polarity requirement of the driven load, so that the electrical review and the layout review sign off against the same values.
Current Consumption: Quiescent Versus Operating Supply Current
Two current figures are documented, and they answer different budgeting questions: a quiescent current of 20 µA and a supply current of 7.0 mA.
| Parameter | Documented value | Budget it applies to |
|---|---|---|
| Quiescent current | 20 µA | Rail powered, device not driving its output |
| Supply current | 7.0 mA | Device operating |
The quiescent figure is the standing drain to use when the rail is powered continuously and the output is idle for long periods. The supply current is the operating figure and belongs in the active-mode budget. Because the two are far apart, a budget built on the wrong row will be wrong by orders of magnitude — an error that is easy to miss when both numbers sit in the same table.
State in the request which condition your design spends most of its time in, and which of the two figures was used for the consumption estimate. That single sentence saves a round of questions later.
Operating Temperature Range: Matching the Application Environment
The stated operating temperature range is –20 to 85 °C.
The check is against the conditions the assembly will actually see: the temperature inside the enclosure, in the orientation the product is installed, alongside any nearby heat source. Compare both ends of the range with the extremes your application can reach. If the assembly is specified for use in conditions that push past either endpoint, the part as described is not the right choice for that position, and the question should go back to the design owner before the order is released.
The second use of the range is in the purchase documentation. Writing it into the technical annex of the request makes the environmental requirement explicit and removes ambiguity about what is being asked for.

Keep the confirmed range with the other checked parameters — package, pin count, supply window, current and on-resistance — so the whole set can be reviewed as one record.
How to Request a Quote
Once the checks above are closed, send NexCir the confirmed part number, A3959SLPTR-T, together with the quantity you need and the technical details you want reflected in the quotation — the supply window, the load current and polarity, the temperature requirement and the package confirmation.
Including the completed checks in the request means the quotation is prepared against the same description your BOM uses, and any open point is raised before the order is placed rather than after. Request a quotation from NexCir when your checklist is complete.